RHINO 1594 Manual do Operador

Consulte online ou descarregue Manual do Operador para Corta-relvas RHINO 1594. RHINO 1594 Operator`s manual [en] [ja] Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 102
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
© 2011 Alamo Group Inc.
$0.00
1594
Published 01/11 Part No. F-4282C
OPERATOR’S MANUAL
RHINO
®
1020 S. Sangamon Ave.
Gibson City, IL 60936
800-446-5158
LOADER
This Operator's Manual is an integral part of the safe operation of this machine and must
be maintained with the unit at all times. READ,
UNDERSTAND, and FOLLOW the Safety
and Operation Instructions contained in this manual before operating the equipment. C01-
Cover
Vista de página 0
1 2 3 4 5 6 ... 101 102

Resumo do Conteúdo

Página 1 - OPERATOR’S MANUAL

© 2011 Alamo Group Inc.$0.001594Published 01/11 Part No. F-4282COPERATOR’S MANUAL RHINO® 1020 S. Sangamon Ave.Gibson City, IL 60936800-446-5158Email:

Página 2 - To the Owner/Operator/Dealer

SAFETY1594 01/11 Safety Section 1-6© 2011 Alamo Group Inc.SAFETYEquipment Operation Safety Instructions and PracticesThis Implement may be wider tha

Página 3 - TABLE OF CONTENTS

RHINO LIMITED WARRANTY1. LIMITED WARRANTIES1.01. Rhino warrants for one year from the purchase date to the original non-commercial, governmental, or

Página 4

TO THE OWNER/OPERATOR/DEALERTo keep your implement running efficiently and safely, read your manual thoroughly and follow these directionsand the Saf

Página 5 - SAFETY SECTION

1594 -SOM-01/11 P/N F-4282CPrinted U.S.A1594LOADER

Página 6

SAFETY1594 01/11 Safety Section 1-7© 2011 Alamo Group Inc.SAFETYDO NOT operate this Implement on a Tractor that is not properly maintained. Should a

Página 7

SAFETY1594 01/11 Safety Section 1-8© 2011 Alamo Group Inc.SAFETYDo not let the loader or attachment contact electrical power lines. Contactwith elec

Página 8

SAFETY1594 01/11 Safety Section 1-9© 2011 Alamo Group Inc.SAFETYDo not use an attachment that is not securely attached to the quickhitch, The attach

Página 9 - (SG-33)

SAFETY1594 01/11 Safety Section 1-10© 2011 Alamo Group Inc.SAFETYKnow before you DIG. Call 888-258-0808 and request that all buried utilities locati

Página 10

SAFETY1594 01/11 Safety Section 1-11© 2011 Alamo Group Inc.SAFETYNever leave the Implement and Power Unit unattended while the Implement is in the r

Página 11

SAFETY1594 01/11 Safety Section 1-12© 2011 Alamo Group Inc.SAFETYConnecting or Disconnecting Implement Safety Instructions and PracticesDo not stand

Página 12

SAFETY1594 01/11 Safety Section 1-13© 2011 Alamo Group Inc.SAFETYTransporting Safety Instructions and PracticesTransport only at speeds where you ca

Página 13

SAFETY1594 01/11 Safety Section 1-14© 2011 Alamo Group Inc.SAFETYMaintenance and Service Safety Instructions and PracticesLower the loader to the be

Página 14

SAFETY1594 01/11 Safety Section 1-15© 2011 Alamo Group Inc.SAFETYNever work under the Implement, the framework, or any lifted componentunless the Im

Página 15

To the Owner/Operator/DealerAll implements with moving parts are potentially hazardous. There is no substitute for a cautious, safe-mindedoperator wh

Página 16 - Practices

SAFETY1594 01/11 Safety Section 1-16© 2011 Alamo Group Inc.SAFETYStorage and Parking Safety Instructions and PracticesConcluding Safety Instructions

Página 17

SAFETY1594 01/11 Safety Section 1-17© 2011 Alamo Group Inc.SAFETYDecal LocationNOTE: Rhino supplies safety decals on this product to promote safe op

Página 18

SAFETY1594 01/11 Safety Section 1-18© 2011 Alamo Group Inc.SAFETYITEM PART NO. QTY LEVEL DESCRIPTION1. D469 1 WARNING Loader Safety2. D468 2 DANGER

Página 19

SAFETY1594 01/11 Safety Section 1-19© 2011 Alamo Group Inc.SAFETYDecal DescriptionLoader Safety-Read, understand and follow the operation, warning,a

Página 20

SAFETY1594 01/11 Safety Section 1-20© 2011 Alamo Group Inc.SAFETYWARNING! - DO NOT operate with oil leaks. -Inspect hoses regularly. Failure to insp

Página 21 - Decal Location

SAFETY1594 01/11 Safety Section 1-21© 2011 Alamo Group Inc.SAFETYRhino, LeftP/N 49696Rhino, RightP/N 51448Slow Moving Vehicle Decal. Keep SMV reflec

Página 22

SAFETY1594 01/11 Safety Section 1-22© 2011 Alamo Group Inc.SAFETYWARNING! - Crushing Hazard. -To Avoid Serious Injury or DeathMake sure attachment i

Página 23 - Decal Description

SAFETY1594 01/11 Safety Section 1-23© 2011 Alamo Group Inc.SAFETYFederal Laws and RegulationsThis section is intended to explain in broad terms the

Página 25

Introduction Section 2-1INTRODUCTION SECTION

Página 26 - P/N D516

TABLE OF CONTENTSSAFETY SECTION ... 1-1Gen

Página 27 - Federal Laws and Regulations

INTRODUCTION1594 01/11 Introduction Section 2-2© 2011 Alamo Group Inc.INTRODUCTIONThe 1594 Loader is designed with care and built with quality mater

Página 28

INTRODUCTION1594 01/11 Introduction Section 2-3© 2011 Alamo Group Inc.INTRODUCTIONDO NOT use drugs or alcohol immediately before or while operating

Página 29 - INTRODUCTION SECTION

INTRODUCTION1594 01/11 Introduction Section 2-4© 2011 Alamo Group Inc.INTRODUCTIONThe RHINO 1594 Loader is designed for four-wheel drive tractors. T

Página 30 - INTRODUCTION

INTRODUCTION1594 01/11 Introduction Section 2-5© 2011 Alamo Group Inc.INTRODUCTIONAttention Owner/OperatorBEFORE OPERATING THIS MACHINE:1. Carefully

Página 32

Assembly Section 3-1ASSEMBLY SECTION

Página 33

ASSEMBLY1594 01/11 Assembly Section 3-2© 2011 Alamo Group Inc.ASSEMBLYGeneral InformationMounting Kit can be installed using tools ordinarily availa

Página 34

ASSEMBLY1594 01/11 Assembly Section 3-3© 2011 Alamo Group Inc.ASSEMBLYPreparing TractorShut off engine, engage brakes and remove key during installa

Página 35 - ASSEMBLY SECTION

ASSEMBLY1594 01/11 Assembly Section 3-4© 2011 Alamo Group Inc.ASSEMBLYInstalling Left and Right Midmounting Brackets1. Unfasten valve mount from rig

Página 36 - ASSEMBLY

ASSEMBLY1594 01/11 Assembly Section 3-5© 2011 Alamo Group Inc.ASSEMBLYPlumbing Loader1. Connect hoses to the adapter fittings, starting from the bot

Página 37

Operating the Tractor and Loader ...

Página 38

ASSEMBLY1594 01/11 Assembly Section 3-6© 2011 Alamo Group Inc.ASSEMBLYAttaching Bucket to LoaderTo avoid injury during installation of bucket, do no

Página 39

ASSEMBLY1594 01/11 Assembly Section 3-7© 2011 Alamo Group Inc.ASSEMBLYConnecting Quick Attach Device (Optional)Attaching Quick Attach and Bucket to

Página 40

ASSEMBLY1594 01/11 Assembly Section 3-8© 2011 Alamo Group Inc.ASSEMBLY• Examine the fit between the quick hitch and thebottom of the attachment brac

Página 41

ASSEMBLY1594 01/11 Assembly Section 3-9© 2011 Alamo Group Inc.ASSEMBLYDismounting the Loader1. Locate tractor and loader on firm level ground.2. Wit

Página 42

ASSEMBLY1594 01/11 Assembly Section 3-10© 2011 Alamo Group Inc.ASSEMBLYMounting LoaderMounting is basically reverse of dismounting.To avoid injury d

Página 43

Operation Section 4-1OPERATION SECTION

Página 44

OPERATION1594 01/11 Operation Section 4-2© 2011 Alamo Group Inc.OPERATIONRHINO 1594 LOADEROPERATION INSTRUCTIONSYour 1594 Loader should now be assem

Página 45 - OPERATION SECTION

OPERATION1594 01/11 Operation Section 4-3© 2011 Alamo Group Inc.OPERATION1. Standard Equipment and Specifications• Model 1594 Loaders are compatible

Página 46 - OPERATION

OPERATION1594 01/11 Operation Section 4-4© 2011 Alamo Group Inc.OPERATION2. Operator RequirementsDO NOT use drugs or alcohol immediately before or w

Página 47

OPERATION1594 01/11 Operation Section 4-5© 2011 Alamo Group Inc.OPERATIONAlways read carefully and comply fully with the manufacturer’sinstructions

Página 48

Safety Section 1-1SAFETY SECTION

Página 49

OPERATION1594 01/11 Operation Section 4-6© 2011 Alamo Group Inc.OPERATIONRepeated or substantial breathing of hazardous dusts, includingcrystalline

Página 50

OPERATION1594 01/11 Operation Section 4-7© 2011 Alamo Group Inc.OPERATION3. Tractor RequirementsTractor Requirements and Capabilities• ASABE approve

Página 51

OPERATION1594 01/11 Operation Section 4-8© 2011 Alamo Group Inc.OPERATION3.3 Tractor BallastBefore operating tractor and loader, add sufficient coun

Página 52

OPERATION1594 01/11 Operation Section 4-9© 2011 Alamo Group Inc.OPERATION4. Getting On and Off the Tractor4.1 Boarding the Tractor3.4 Tractor Ballas

Página 53

OPERATION1594 01/11 Operation Section 4-10© 2011 Alamo Group Inc.OPERATION4.2 Dismounting the TractorNever allow children or other persons to ride o

Página 54

OPERATION1594 01/11 Operation Section 4-11© 2011 Alamo Group Inc.OPERATION5. Starting the TractorNever run the Tractor engine in a closed building o

Página 55

OPERATION1594 01/11 Operation Section 4-12© 2011 Alamo Group Inc.OPERATION6. Pre-Operation Inspection and ServicePeriodically inspect all moving par

Página 56

OPERATION1594 01/11 Operation Section 4-13© 2011 Alamo Group Inc.OPERATION6.2 Loader Pre-Operation Inspection and ServiceBefore operation, a complet

Página 57

OPERATION1594 01/11 Operation Section 4-14© 2011 Alamo Group Inc.OPERATIONThe operator’s manual and safety signs affixed onthe unit contain importan

Página 58

OPERATION1594 01/11 Operation Section 4-15© 2011 Alamo Group Inc.OPERATIONHYDRAULIC LINE INSPECTION• Check for hydraulic leaks along hoses,cylinders

Página 59

SAFETY1594 01/11 Safety Section 1-2© 2011 Alamo Group Inc.SAFETYGeneral Safety Instructions and PracticesA careful operator is the best operator. Sa

Página 60

OPERATION1594 01/11 Operation Section 4-16© 2011 Alamo Group Inc.OPERATIONTractor PRE-OPERATION InspectionTractor ID#______________________ Make____

Página 61

OPERATION1594 01/11 Operation Section 4-17© 2011 Alamo Group Inc.OPERATIONFRONT END LOADER PRE-OPERATION InspectionFront End Loader ID#_____________

Página 62

OPERATION1594 01/11 Operation Section 4-18© 2011 Alamo Group Inc.OPERATION7. Driving the Tractor and LoaderThis Implement may be wider than the Trac

Página 63

OPERATION1594 01/11 Operation Section 4-19© 2011 Alamo Group Inc.OPERATIONSafe tractor transport requires the operator possess a thorough knowledge

Página 64

OPERATION1594 01/11 Operation Section 4-20© 2011 Alamo Group Inc.OPERATION7.3 Driving the Tractor and Loader7.4 Operating the Tractor and LoaderDo n

Página 65

OPERATION1594 01/11 Operation Section 4-21© 2011 Alamo Group Inc.OPERATIONThe Boom is designed only to position and operate the Bucket which is atta

Página 66

OPERATION1594 01/11 Operation Section 4-22© 2011 Alamo Group Inc.OPERATIONCarry the loader and attachment low when transporting to reduce thepotenti

Página 67

OPERATION1594 01/11 Operation Section 4-23© 2011 Alamo Group Inc.OPERATIONDo not operate the loader from the ground. Operate the tractor and loader

Página 68

OPERATION1594 01/11 Operation Section 4-24© 2011 Alamo Group Inc.OPERATIONOperate the tractor and loader only in conditions where you have clear vis

Página 69

OPERATION1594 01/11 Operation Section 4-25© 2011 Alamo Group Inc.OPERATIONAlways have a heavy attachment, such as a bucket mounted on loader when it

Página 70

SAFETY1594 01/11 Safety Section 1-3© 2011 Alamo Group Inc.SAFETYNever allow children to operate, ride on, or come close to the Tractor orImplement.

Página 71

OPERATION1594 01/11 Operation Section 4-26© 2011 Alamo Group Inc.OPERATIONEase lever back toward you to lift and roll backbucket.Lift and roll back

Página 72

OPERATION1594 01/11 Operation Section 4-27© 2011 Alamo Group Inc.OPERATIONLIFTING THE LOADWhen lifting the load, keep the bucket positionedto avoid

Página 73

OPERATION1594 01/11 Operation Section 4-28© 2011 Alamo Group Inc.OPERATIONUse extreme care when operating loader on aslope, keep bucket as low as po

Página 74

OPERATION1594 01/11 Operation Section 4-29© 2011 Alamo Group Inc.OPERATIONLOWERING THE BUCKETAfter bucket is dumped, back away from vehiclewhile low

Página 75

OPERATION1594 01/11 Operation Section 4-30© 2011 Alamo Group Inc.OPERATIONLOADING FROM A BANKChoose a forward gear that provides sufficientground sp

Página 76

OPERATION1594 01/11 Operation Section 4-31© 2011 Alamo Group Inc.OPERATIONAnother method for large dirt piles is to build aramp approach to the pile

Página 77

OPERATION1594 01/11 Operation Section 4-32© 2011 Alamo Group Inc.OPERATIONPEELING AND SCRAPINGUse a slight bucket angle, travel forward andhold lift

Página 78

OPERATION1594 01/11 Operation Section 4-33© 2011 Alamo Group Inc.OPERATIONLOADING LOW TRUCKS OR SPREADERS FROM A PILEFor faster loading, minimize an

Página 79

OPERATION1594 01/11 Operation Section 4-34© 2011 Alamo Group Inc.OPERATIONBACKFILLINGPoor methods actually move no more dirt andmake it more difficu

Página 80

OPERATION1594 01/11 Operation Section 4-35© 2011 Alamo Group Inc.OPERATIONLeave dirt in bucket. Dumping on each passwastes time.Operate tractor at r

Página 81

SAFETY1594 01/11 Safety Section 1-4© 2011 Alamo Group Inc.SAFETYOperator Safety Instructions and PracticesNever operate the Tractor or Implement unt

Página 82

OPERATION1594 01/11 Operation Section 4-36© 2011 Alamo Group Inc.OPERATIONLeave dirt which drifts over side of bucket forfinal cleanup.Pile dirt on

Página 83

OPERATION1594 01/11 Operation Section 4-37© 2011 Alamo Group Inc.OPERATION7.6 Operating Bale Spear Operate the bale spear using extreme caution. Sha

Página 84

OPERATION1594 01/11 Operation Section 4-38© 2011 Alamo Group Inc.OPERATIONCarry bales as low to the ground as possible toallow maximum visibility an

Página 85

OPERATION1594 01/11 Operation Section 4-39© 2011 Alamo Group Inc.OPERATIONThe tractor is equipped with a valve lockmechanism located between the ope

Página 86

OPERATION1594 01/11 Operation Section 4-40© 2011 Alamo Group Inc.OPERATION9. Transporting the Tractor and ImplementNever allow children or other per

Página 87

OPERATION1594 01/11 Operation Section 4-41© 2011 Alamo Group Inc.OPERATIONLower the loader to the bed of the truck or trailer when transporting thet

Página 88

OPERATION1594 01/11 Operation Section 4-42© 2011 Alamo Group Inc.OPERATION9.1 Transporting on Public RoadwaysMake certain that the “Slow Moving Vehi

Página 89 - MAINTENANCE SECTION

OPERATION1594 01/11 Operation Section 4-43© 2011 Alamo Group Inc.OPERATION9.2 Hauling the Tractor and ImplementBefore transporting a loaded tractor

Página 90

OPERATION1594 01/11 Operation Section 4-44© 2011 Alamo Group Inc.OPERATION10. Troubleshooting GuideTROUBLE POSSIBLE CAUSE POSSIBLE REMEDYLoader slow

Página 91 - MAINTENANCE

Maintenance Section 5-1MAINTENANCE SECTION

Página 92

SAFETY1594 01/11 Safety Section 1-5© 2011 Alamo Group Inc.SAFETYProlonged operation may cause operator boredom and fatigue affecting safe operation.

Página 93

MAINTENANCE1594 01/11 Maintenance Section 5-2© 2011 Alamo Group Inc.MAINTENANCE READ, UNDERSTAND, and FOLLOW the following Safety Messages. Ser

Página 94

MAINTENANCE1594 01/11 Maintenance Section 5-3© 2011 Alamo Group Inc.MAINTENANCENEVER perform maintenance beneath a raised loader unless loader is pr

Página 95

MAINTENANCE1594 01/11 Maintenance Section 5-4© 2011 Alamo Group Inc.MAINTENANCELubrication ScheduleBefore operating your Loader, take the time to in

Página 96

MAINTENANCE1594 01/11 Maintenance Section 5-5© 2011 Alamo Group Inc.MAINTENANCEDaily MaintenanceRegular maintenance of your loader and hydraulic sys

Página 97

MAINTENANCE1594 01/11 Maintenance Section 5-6© 2011 Alamo Group Inc.MAINTENANCEStorageNOTE: When loader hydraulics are disconnected from tractor, th

Página 98

MAINTENANCE1594 01/11 Maintenance Section 5-7© 2011 Alamo Group Inc.MAINTENANCE3. Do not remove attachment from stored loader.4. Do not allow childr

Página 99

MAINTENANCE1594 01/11 Maintenance Section 5-8© 2011 Alamo Group Inc.MAINTENANCEProper Torque for FastenersThe chart lists the correct tightening tor

Página 100 - Email: [email protected]

MAINTENANCE1594 01/11 Maintenance Section 5-9© 2011 Alamo Group Inc.MAINTENANCE

Página 101

MAINTENANCE1594 01/11 Maintenance Section 5-10© 2011 Alamo Group Inc.MAINTENANCE

Comentários a estes Manuais

Sem comentários